EXTENSION AUDIT
GARAGE CONVERSION AUDIT
STRUCTURAL LOFT CONVERSION AUDIT
PRE-PURCHASE FEASABILITY CONSULTATION
TEMPORARY WORKS
STEEL WORK CONNECTIONS
SITE VISIT
INTERIOR MINOR ALTERATIONS
CDM & ASSOCIATED REPORTS
HEALTH & SAFETY REPORTS
3D MODELLING (from)
PROJECT MANAGEMENT
SOIL INVESTIGATION REPORTS
AIR PRESSURE TESTING
SOUND TESTING
BUILDING CONTROL APPLICATIONS
AIR TIGHTNESS TESTING
SOUND INSULATION TESTING
PART F VENTILATION TESTING
RENEWABLE ENERGY ADVICE & INSTALL
ENERGY STATEMENTS
THERMOGRAPHIC SURVEYS & TESTING
CODE FOR SUSTAINABLE HOMES
PART G WATER CALCS
DOMESTIC EPC’S FOR LANDLORDS & HOMEOWNERS
Most people don't struggle to imagine their dream home, they struggle to get from the idea to a finished, liveable space without stress, cost creep, or endless delays.
Whether you're planning an extension, loft conversion, renovation, or even a new build, the process is much easier when you follow a clear sequence.
Here's a practical, homeowner-friendly roadmap to help you get to your dream home in 10 easy steps, with the right checks at the right time.
Start with outcomes, not Pinterest.
Ask:
Tip: write a one-paragraph brief you can share with your designer and builder.
Your budget should include more than construction.
Common cost buckets:
A contingency is not pessimism, it's how you avoid panic decisions later.
Feasibility is where you avoid expensive dead ends.
Key checks often include:
If you're in Sussex or Surrey, feasibility should also consider local planning patterns and constraints.
There are different ways to run a project:
If you want fewer handoffs, fewer gaps, and clearer accountability, an integrated team can be a big advantage.
A dream home is mostly about flow.
Focus on:
This is the stage where you make the biggest value decisions.
Planning is about whether you're allowed to do the work.
You may be able to build under:
Even if you're using PD, consider getting a Lawful Development Certificate (LDC) for peace of mind and future saleability.
This is where your dream becomes buildable.
Technical design typically covers:
Good technical design reduces surprises on site, and protects your budget.
Finishes can delay projects more than people expect.
Create a simple decision plan:
If you're aiming for a high-end result, consistency beats complexity.
A smooth build is usually the result of:
Ask upfront how changes are handled, how variations are priced, and how progress is reported.
The last 5% matters.
Make sure you have:
Your dream home should feel great on day one, and still perform beautifully years later.
Write a simple brief and set a realistic budget (including fees and contingency). Then do a feasibility check before committing to a design direction.
It depends on scope, permissions, and complexity. A well-planned project is faster because it avoids redesign, delays, and on-site surprises.
Not always. Some projects fall under permitted development, but many require planning permission. Either way, Building Regulations usually apply.
Clear scope, early technical design, and disciplined finish selections are the biggest levers.
At STAAC, we bring architects, structural engineers, and builders under one roof, so your project isn't passed between three separate companies.
That means: